REFERENCES

Successfully realised projects

HIGHLIGHTED PROJECTS

INA RNR, PPS PROJECT

Installation, welding, ACP, insulation, startup

VODOVOD RIJEKA, VODOSPREMA

Prefabrication, installation, ACP, startup

 

PLACE / OBJECT INVESTOR WORK DESCRIPTION YEAR
Labin HOLCIM Annual overhaul 2021
Rafinerija Urinj STSI Installation and welding of 2.5 km of 2″ nitrogen pipeline 2021
Rafinerija Urinj STSI Annual overhaul 2021
Rafinerija Urinj STSI Fabrication of steel structure 2021
Rafinerija Urinj STSI Ventilation reconstruction 2021
Rafinerija Urinj INA Concreting of the foundation for the container settlement 2021
Bjelovar KRONOSPAN Annual overhaul 2020
Čakovec PRIMABIRO Production of boilers for transformers 2020
Dugo selo DALEKOVOD Anticorrosive protection of steel by hot dip galvanizing 2020
Kuljanovo KD VODOVOD I KANALIZACIJA RIJEKA Prefabrication and installation of plumbing 2020
Rafinerija Urinj STSI Flare overhaul 2020
Rafinerija Urinj INA Welding and assembly of a 5.2 km long pipeline for the PPS project 2020
Termoelektrana Plomin HEP Annual overhaul 2020
Rafinerija Urinj INA Construction of auto filling station AP2 2020
Rijeka HILTON Rijeka Costabella Beach resort & Spa Installation of insulation 2020
Rafinerija Urinj INA Insulation 5.2 km long pipeline 2020
Rafinerija Urinj INA Design and installation of an outdoor workshop 2020
Rafinerija Urinj INA Concreting the foundation for the outdoor workshop 2020
Rafinerija Urinj INA Relocation and installation of the distillation Column C! 2019
Rafinerija Urinj INA Reconstruction of tanks and tanks and pipelines 2019
Rafinerija Urinj INA Prefabrication and assembly of pipelines on the amine unit 2019
Rafinerija Urinj INA Overhaul of oil refining plant “TOPPING 3” 2019
Rafinerija Urinj INA Pipeline replacement on “TOPPING 3” 2019
Rafinerija Urinj INA Overhaul and repair of pressure vessels and air coolers 2019
Rafinerija Urinj INA Reconstruction of the pressure reduction system 37/13 bar in the power plant operation 2019
Rafinerija Urinj INA Reconstruction of steam cooling station (RRS) 2019
Bjelovar KRONOSPAN Reconstruction and modernization of wood processing plants 2019
Elektrana Zagreb HEP Reconstruction and replacement of pipelines 2019
Dugo Selo DALEKOVOD Production of steel structures 2019
Omišalj JANAF Welding and assembly of oil tanks 2018
Rafinerija Urinj INA Overhaul and repair of heat exchangers 2018
Rafinerija Sisak INA Annual overhaul 2018
Toplana Zagreb HEP Reconstruction and replacement of pipelines 2018
Čakovec LETINA Complete production of SS (Stainless steel) tanks with a capacity of up to 1100 l, and a diameter of up to 40 2018
Kostrena BRODOGRADILIŠTE VIKTOR LENAC Welding and assembly of ballast pipelines 2018
Kostrena BRODOGRADILIŠTE VIKTOR LENAC Assembly and TIG welding 2018
Toplana Zagreb HEP Annual overhaul 2018
Rafinerija Urinj INA Construction of auto filling station AP1 2018
Velika Gorica DALEKOVOD Production of parts for transmission lines 2018
Antwerp Belgija NIPPON Assembly and TIG welding 2017
Leverkusen Njemačka BAYER Installation of pipelines and accompanying metal structures 2017
Rafinerija URINJ INA Installation of tanks and accompanying pipelines for storage of propane and propylene 2017
Petrokemija Kutina PETROKEMIJA Annual overhaul 2017
Rafinerija Urinj STSI Reconstruction of the pumping station 2017
Rijeka BRODOGRADILIŠTE 3.MAJ Welding and assembly of double-sided and double-sided 2016
Rijeka BRODOGRADILIŠTE 3.MAJ Welding of the outer hull of the ship 2016

 

Partners

 
Ina
Letina
Tehnomehanika
Cimolai
STSI
KT
Prima biro
Fero kotao
Viktor lenac
Monting logo
Bimont
VIK
HEP
 

Contact

Gemini global d.o.o.
info@gemini-global.hr
+385/99 736 7008
Rijeka, Croatia

12 + 10 =